Mobilization campaign - Highway 20 - Vaudreuil-Soulanges

It’s time to get moving!

One highway. A 7-km gap left unfinished. 60 years of waiting. Up to 90,000 vehicles a day at peak times. More than 21.5 million vehicles a year.

It’s time to finish it.

© Christian Gonzalez

A region taking action

A unanimous resolution
from the MRC de Vaudreuil-Soulanges

Resolutions from neighbouring municipalities: L’Île-Perrot, Notre-Dame-de-l’Île-Perrot, Pincourt, Terrasse-Vaudreuil and Vaudreuil-Dorion

A resolution from Développement Vaudreuil-Soulanges (DEV)

A resolution from the Chambre de commerce et d’industrie de Vaudreuil-Soulanges (CCIVS)

A citizen petition with 16,222 signatures

A campaign led by

In the heart of Vaudreuil-Soulanges, Highway 20 comes to an abrupt stop, creating a bottleneck along one of the main travel corridors between Montréal and Toronto. Ten traffic lights, daily congestion and up to 90,000 vehicles a day at peak times: this reality affects quality of life, the local economy and the region’s overall appeal.

After years of inaction, the consequences are real: more than $1.1 billion in avoidable losses over the next 20 years. It’s time for the Québec government to include the Highway 20 optimization project in the Québec Infrastructure Plan (PQI).

© Christian Gonzalez
Harwood Boulevard — Route 342 Galipeault Bridge

Ten traffic lights interrupting a national highway.

The goal: a true, uninterrupted highway link from Harwood Boulevard to the Galipeault Bridge.

21 M+ (vehicles/year)

More than 21.5 million vehicles travel this segment each year.

90 K (vehicles/day)

Average daily traffic over the year.

1 in 10

Vehicles is a freight truck (11.4% of traffic).

10 (traffic lights)

On an urban boulevard that should be a highway.

1.1 (B$ / 20 years)

Cost of the status quo according to the Raymond Chabot Grant Thornton study.