The long wait

Sixty years of promises, studies and patience

Completing Highway 20 is not a new idea. The land has been in government hands since expropriations began in the 1960s. Here is the road travelled so far — and the one step still to be taken.

1960
Project under study · Expropriations begin

1970
The road becomes Highway 20

1980
New assessment of the project

2000
MTQ and Environment Ministry analysis

2010
Halted at the BAPE · Mobility working group

2020
New analysis · MRC’s brief

2025
MTMD and MRC recommendations align

Next step
Political decision and inclusion in the PQI

1960s

First sections built

The first sections of what is now Highway 20 are put into service in the area.

1964

Expropriations on Île Perrot and in Vaudreuil-Dorion

The Québec government expropriates several parcels of land to make it possible to complete the highway. These properties still belong to the government today.

1960s to 2000

Land acquisitions and studies

The Ministry of Transport (MTQ) continues to acquire land and conducts numerous technical studies.

2000

Analysis of a completion project

The MTQ formally analyzes a project to complete Highway 20. The project is included in the Québec Infrastructure Plan (PQI).

2009–2010

Halted before filing with the BAPE

Work is stopped just as the project is about to be submitted to the BAPE, and the project is removed from the PQI by the Québec government.

2010–2018

Repeated calls to revive the project

The MRC, local municipalities and the public repeatedly call on the ministry to revive the project.

2018–2022

Mobility working groups

The Québec government establishes a working group to develop, with the community, a shared mobility vision for the Highway 20 corridor.

2023

A new study

The Ministry of Transport and Sustainable Mobility (MTMD) begins a new study on optimizing Highway 20.

2023

Economic impact study of the status quo

Développement Vaudreuil-Soulanges commissions Raymond Chabot Grant Thornton to conduct an economic impact study on the cost of not completing Highway 20.

February 2024

The MRC de Vaudreuil-Soulanges’ unanimously adopted brief

Supported by an economic impact study and a consensus among the mayors of Vaudreuil-Dorion and the municipalities of Île Perrot, the brief proposes an alternative to the MTMD’s scenarios: uninterrupted traffic flow with no traffic lights.

May 2025

The MTMD’s technical recommendation

The ministry concludes that an uninterrupted highway link is the most advantageous solution, based on its multi-criteria analysis and cost-benefit analysis. For the first time, the region and the government have reached the same conclusion. These studies remain valid for a limited period of 10 years, after which they must be updated. The time to act is now — before the entire process has to start over.

January 2026

Meeting with the minister and a resolution

The MRC meets with the MTMD and adopts a resolution calling for the project to be included in the PQI. Municipalities and the business community follow suit.

Next step

Inclusion in the Québec Infrastructure Plan

This is the key that unlocks everything. Without inclusion in the PQI, the project cannot move forward. This is where your voice matters, just months before the October 5, 2026 election.